桥面防水
Bridge deck waterproof
Bridge is occupying such important effect in our life, bridge deck waterproof construction but can't careless at all, so, after all, bridge deck waterproof construction to go through a few procedures can be considered qualified?
Below small make up for everyone to introduce the bridge deck waterproof construction methods and matters needing attention.

The construction steps of bridge deck waterproof are as follows:

1, before the roll shop to keep dry, and the surface debris, floating pulp removal;
The lap length of the coil shall be no less than 10cm on the long side and 15cm on the short side.
The joints of the upper and lower layers and the adjacent two pieces of coils shall be staggered, and the upper and lower layers of coils shall not be perpendicular to each other;
The thickness of asphalt glue used for pasting the roll shall be controlled from 1.5mm to 2.5mm, and shall not exceed 3mm;
In the place close to the decorative fence, the lap joints of the coil shall be retained on the bottom surface not less than 60cm away from the decorative fence;
In the concrete bridge deck pavement and decorative guardrail at the junction of the rolling waterproof layer, to be laid in advance of the intersection with obtuse Angle or circular arc, at the same time in the laying of the waterproof layer on the additional layer, the additional layer using two layers of the same asphalt felt or a layer of asphalt glass cloth asphalt felt, paving paste according to the shape of the junction close;
When the joint is composed of three surfaces in different directions, in addition to the additional layer, add a layer of asphalt glass cloth linoleum or metal sheet to strengthen;
Pasting rolling material to show flat compaction, rolling material and concrete bridge deck pavement and between the layers of roll must bond closely, and the paving of asphalt cement material extrusion, lap joints must be sealed tightly, to prevent the emergence of waterways;
After pasting the last layer of coiled material, the surface shall be coated with a layer of hot asphalt cementing material with a thickness of 1mm ~ 1.5mm.
Coiled material waterproof layer when the shop is stuck the control of the temperature is not lower than + 5 ℃, otherwise in greenhouses.
Bitumen glue working temperature is not lower than 150 ℃.

Precautions for bridge deck waterproof construction:

Paint should be stirred evenly before use
It is not expected that the coating table before the rain can not be construction
During the construction process, it is strictly forbidden to step on the wet waterproof layer
After the waterproof layer is finished, strict protection should be taken before the asphalt concrete paving layer is put on. When the waterproof layer is dry, cars under 10t can be put on it, but they are not allowed to bend, reverse or brake sharply.
Trucks, forklifts and cranes above 10t are not allowed to pass through.

Concrete technical requirements for waterproof layer of bridge deck

Bridge deck waterproof layer should cover the entire concrete bridge deck, waterproof layer for two lines of defense, the first spray cement concrete surface waterproof agent twice, the second spray bridge deck waterproof coating two to four times, the average thickness of waterproof coating film should not exceed 2mm.
Waterproof layer should have good durability, at least under the bridge deck asphalt pavement service life (about 8 ~ 10 years).
In addition, it can adapt to the dynamic load and tension resistance of viaduct. When the crack of concrete bridge slab is less than 2mm, the deformation of waterproof coating film should still meet the need of non-tensile crack to ensure the waterproof requirements.
In the environmental conditions - 15 ~ + 90 ℃ range, can meet the requirements of article 2.
At the same time, after being paving asphalt layer temperature about 160 ℃, does not affect its long-term durability usability.
Waterproof coating and the compatibility of an asphalt concrete pavement, the cohesive force between them is not lower than that of asphalt concrete pavement and concrete bridge deck, the cohesive force between the interlaminar shear strength of 25 ℃, acuity 1.5 MPa, 35 ℃ or higher 1 MPa.
Spraying water-proofing agent on the surface of cement concrete should ensure that the water-proofing agent can infiltrate more than 10mm of bridge concrete to improve the impermeability of concrete > 0.2mpa.
The waterproof coating should also have good adhesion to the concrete bridge panel, so as to ensure the adhesion of asphalt pavement layer, and have good tightness on the rough bridge panel.
No air layer shall be clamped after the waterproof layer is bonded.
The impermeability of waterproof layer should be more than 0.3mpa.
Waterproof construction should be easy to operate, to meet the requirements of the bridge construction schedule.

Bridge deck concrete construction requirements

In order to improve the shear strength between waterproof layer and asphalt concrete pavement layer and concrete bridge deck, it is necessary for concrete bridge deck to be treated with wool.
The test shows that the concrete surface is a natural flat surface, and the shear strength is difficult to meet the specified requirements. After proper wool treatment, the interlocking force and harbor resistance between the waterproof layer and asphalt concrete pavement layer and the concrete interface are greatly improved.
Therefore, its shear strength can exceed the requirements of regulations, so as to create good conditions for a long time after the road surface vehicles do not appear wrinkled, cracks.
The specific requirements for drawing are as follows: the depth of drawing is 3mm, the width is 4mm, and the net distance between adjacent drawing is 24mm.



Key words: bridge deck waterproof bridge deck waterproof construction